The Building and Construction Award remains one of the most complex and in-depth modern awards in the Australian employment landscape due to the unique travelling requirements and broad areas of specialisation.
You can also read our Ultimate Building and Construction Award (MA000020) Summary too as well as downloading our eBook which includes a bonus payroll processing checklist to ensure your business is compliant with all of the award requirements.
If you’re looking to gain a better understanding of the travel conditions in the Building and Construction General On-Site Award 2010, we wrote an article that explains everything you need to know about travel conditions.
Below are 8 conditions in the General On-Site Award that are commonly missed by building and construction employers.
Period of continuous services with a building and construction industry employer |
Redundancy/severance pay |
Less than one year |
1.75 hours per week of service |
Over one year but less than two years |
2.4 weeks’ pay + 1.75 hours pay per completed week of service for service over one year. This is at a maximum of 4.8 weeks’ pay |
Over two years but less than three years |
4.8 weeks’ pay + 1.6 hours pay per completed week of service for service over two years. This is at a maximum of 7 weeks’ pay |
Over three years but less than four years |
Seven weeks’ pay + 0.73 hours pay per completed week of service for service over three years. This is at a maximum of 8 weeks’ pay |
Over four years |
Eight weeks’ pay |
Building and Construction Award Industry |
Industry Allowance (% of weekly rate) |
Building and construction general on-site industry |
6% |
Civil construction industry |
6% |
Metal and engineering construction industry |
6% |
Residential building and construction general on-site industry |
4.8% |
In these situations, the Building and Construction General On-Site Award proposes certain conditions that are applicable when it’s no longer safe to continue work:
Commenced Working |
Hours Credited |
First Week |
32 hours |
Second Week |
24 hours |
Third Week |
16 hours |
Fourth Week |
8 hours |
Check out our article explaining everything you need to know about travel conditions in the Building & Construction Award.
The article also addresses employers obligations when employees are living away from home and need to perform distant work.
Ordinary hours of work are between 7am to 6pm, Monday to Friday. Work carried outside of these hours will attract a penalty rate of 150% for the first two hours and 200% thereafter.
The ordinary hours of work are 8 hours per day. For every hour, 0.4 hours are accrued towards a rostered day off (RDO). This means that an RDO of 7 ½ hours will be accrued every 19 days of work.
Type of Shift Work |
Hours |
Afternoon shift |
Start after 3pm and finish before 3pm |
Night shift |
Start after 3pm and finish before 11pm |
Early morning shift |
Start after 11pm and finish before 4.30am |
Morning shift |
Start after 4.30am and finish before 6am |
Early afternoon shift |
Start after 11am and finish before 1pm |
Below are the shift work hours of work for the civil construction sector:
Type of Shiftwork |
Hours |
Day Shift |
Start after 6am and finish before 10am |
Afternoon Shift |
Start after 10am and finish before 8p, |
Night Shift |
Start after 8pm and finish before 6am |
According to the General On-Site Award, day workers must have an unpaid meal break of 30 mins within 5 hours while shift workers must have a meal break of 30 minutes that is to be counted as time worked.
Shift |
Penalty Rate |
Comments |
Overtime on Saturday |
150% for the first two hours |
Paid a minimum of 3 hours |
Overtime after midday Saturday |
200% |
Paid a minimum of 3 hours |
Saturday following Good Friday |
250% |
Paid a minimum of 4 hours |
Sunday |
200% |
Paid a minimum of 4 hours |
Public Holidays |
250% |
Paid a minimum of 4 hours |
Employees working overtime on Saturday and Sunday must be allowed 20 minutes of paid crib time after 4 hours of work.
In our experience, given the complexity of the award, many of our clients have opted to adopt Employment Hero's cloud payroll software as a solution to automate compliance and to help with labour cost control. Get in contact with us at Pay Cat if you’re interested in considering this option with the Building and Construction Award or any other modern award.
If you’re not ready yet, download our Ultimate Building and Construction Award Summary eBook and checklist which comprehensively covers everything you need to know including:
Alternatively, if you're interested in making the move to Employment Hero Payroll, book in a free demo with us to find out how you can automate your Building and Construction General On-Site Award compliance with cloud payroll.