Building and Construction General On-site Award 2010 [MA000020]
Back to searchApplies from: 01/07/2024
All employees employed on a service core at more than 15 metres above the highest point of the main structure must be paid the multistorey rate appropriate for the main structure plus an additional $0.76 per hour for work above each additional 15 metres calculated from the highest point reached by the main structure to the highest point reached by the service core in any one day period:
Storeys |
$ per hour |
From the commencement of building to 15th-floor level |
0.71 +0.87 |
From the 16th to 30th-floor level |
0.84 +0.84 |
From the 31st to 45th-floor level |
1.30+0.84 |
From the 46th to 60th-floor level |
1.68 +0.84 |
From the 61st floor level onward |
2.06 +0.84 |
$1.68 per hour plus $0.87 per hour for every 15m above the main structure
This allowance is based on a working condition or a disability as part of working a shift.
Withhold tax from this allowance
This allowance forms part of ordinary times earnings
Include this allowance for payroll tax purposes
Include this allowance as part of gross wages
Gross PAYEVNTEMP47